As of 26 November 2026, Namport's published list of contract awards holds 137 awards that name a winner. Grouped by what each title says, the biggest groups are spares and materials (30), building and civil works (29), consultancy (17) and cargo-handling equipment (15). Few titles mention oil and gas. Most cover the everyday running of two ports.
Key facts
- CrewDog read 137 awards with a named winner on Namport's Notice of Bids Awarded page on 26 November 2026.
- By the year in the reference: 2021: 11, 2022: 12, 2023: 15, 2024: 31, 2025: 37, 2026: 30, plus one from 2018 (CrewDog count, 26 November 2026).
- 73 of the 137 came through requests for quotations (RFQs), going by the reference codes (CrewDog count, 26 November 2026).
- 70 titles name Walvis Bay only, 9 name Lüderitz only, 8 name both ports and 50 name neither (CrewDog count, 26 November 2026).
- 131 awards state a value. As written, they add up to about N$802.5 million, and two tugboat contracts make up 52% of that (CrewDog count, 26 November 2026; caveats below).
How did we count?
From Namport's own list. CrewDog reads Namport's procurement pages every 12 hours, and this article uses the copy read at 07:26 UTC on 26 November 2026. We kept every row that names a winning company: 137 in all. The grouping was done by hand.
Each award went into one group only. We used the title alone, not the documents behind it, and judged each title by its main work: a contract to supply and install a fire system counts as safety gear, not building works. Namport does not group its awards; these groups are our own. A tender split into lots can appear more than once: a 2022 tender for fuel and lubrication products has three rows, one per lot notice.
This article is about Namport alone, and its groups are finer than in our report on both state buyers, so a few counts differ. For NAMCOR and Namport together, read What NAMCOR and Namport buy.
What does Namport buy?
Mostly the goods, works and services a port needs to keep running. Our groups, largest first:
- Spares, materials and consumables: 30. Platform wire ropes, reinforcing steel, ready-mix concrete, bearings, chains and shackles, timber, tyres, welding gas, road paint, crane spares, and tow and work ropes for marine operations.
- Building, civil and electrical works: 29. Port roads, the Walvis Bay main entrance gate complex, water and sewer pipelines, renovations, fencing, high-mast lighting, standby power, the Pelican Point lighthouse, and three-year maintenance contracts for roads, plumbing and rail track.
- Consultancy, studies and professional services: 17. Design and site supervision, business planning, external audit, insurance broking, a legislative review of the Namibian Ports Authority Act, and feasibility studies.
- Cargo-handling equipment and vehicles: 15. Forklifts, reach stackers, mobile and wharf cranes, container spreaders, a motorised grab, buses, and two vehicle repairs.
- Safety, security and fire gear, and pollution response: 14. Protective clothing and boots, a fire management system, fire equipment servicing, alcohol testers, and offshore oil booms for both ports.
- IT, software and networks: 11. Laptops, servers, a firewall, storage, network infrastructure for the new gate complex, design software licences and vehicle tracking.
- Inspections, testing and surveys: 7. Wire rope testing, under-quay sounding, load testing of cargo equipment, a LiDAR survey, a land survey and a geotechnical investigation.
- Cleaning, security guarding and travel services: 6. Cleaning at both ports, a three-year security contract for both ports, and travel management.
- Fuel and lubricants: 4. A 2026 lubricants contract and the three lots of the 2022 fuel and lubrication tender.
- Tugs and diving: 3. Two tugboat contracts and a diving services contract.
- Dredging: 1. Dredging at the ship-lift platform, with disposal of the dredged material.
The list does not show every big project. Namport's 2026 annual report describes entrance channel dredging at Walvis Bay, and none of these 137 titles mentions it.
How much of it is oil and gas work?
Very little so far. Nine titles mention oil and gas, fuel, lubricants or oil booms. Three tie directly to the offshore build-up, all from 2025:
- transactional advisory services for oil and gas supply base operations
- a feasibility and safety study for simultaneous operations at two fuel import jetties at the North Port of Walvis Bay
- a topographic and LiDAR survey of the oil and gas terminal at Walvis Bay
The 2025 oil sea booms for Walvis Bay and Lüderitz are spill-response equipment. The other four are fuel and lubricant supply to the two ports. Namport's bigger oil and gas projects, such as the Berth 9 upgrade and the Lüderitz Bay supply base, had not been awarded by 26 November 2026: see Walvis Bay and oil and gas.
Which port does the work go to?
Mostly Walvis Bay. Of the 137 titles, 70 name Walvis Bay only, 9 name Lüderitz only and 8 name both. The other 50 name no port in the title. They include spares, IT, consultancy and company-wide services such as audit and insurance.
A pattern stands out in Walvis Bay: 15 titles name the Syncrolift, the ship-lift at Walvis Bay that lifts vessels out of the water for repair. They cover platform timber, docking ropes and hooks, wire rope testing, rail materials, a workshop roof, the substation and dredging. Namport's 2026 annual report puts Syncrolift occupancy at 64% against a 72% target in the year to March 2026.
How does Namport buy?
Mostly through requests for quotations. Going by the reference codes:
- 73 requests for quotations (RFQ)
- 28 open national bidding (ONB)
- 15 requests for proposals (RFP), mostly for consultants and other professional services
- 12 open international bidding (OIB)
- 8 restricted bidding (RB)
- 1 with another code
RFQ awards are small. Of those that state a value, the middle RFQ award is about N$144,000, against about N$3.9 million for open national bidding. Registering as a Namport supplier is how you see these notices: see Namport procurement: how to register and bid.
How are the awards spread over the years?
By the year in the reference: one in 2018, then 11 in 2021, 12 in 2022, 15 in 2023, 31 in 2024, 37 in 2025 and 30 so far in 2026.
The mix changes too:
- 27 of the 30 spares and materials awards date from 2024 to 2026, 12 of them from 2026.
- 8 of the 17 consultancy awards date from 2025.
- Every cargo-handling equipment and vehicle award dates from 2021 to 2025.
Read this as what Namport's page still lists, not as a measure of how much it spends each year.
What are the awards worth?
Treat the totals with care. 131 of the 137 awards state a value, and as written they add up to about N$802.5 million. But:
- Two tugboat contracts make up 52%. A 2024 contract to design, build and deliver tugboats states N$243.4 million, and a 2025 contract to lease or buy one harbour tug states N$176.8 million.
- Many run for years. 29 titles describe a contract period, from 12 months to three years.
- Some have no single total. Five give unit or hourly rates, and one is in euros.
- Joint awards count once. Nine of the notices name joint winners; each is counted once.
- Values are as written. We have not checked them for VAT, variations or what was finally paid.
The middle value of the 131 is about N$680,000, so a typical Namport award is modest. Do not read the total as the size of the market.
What does this mean for a supplier?
- Repeat buying is the norm. Ropes, steel, timber, protective gear and fire servicing come up in several years, often as small RFQs.
- Marine and rigging items recur. Wire ropes, chains, shackles, timber and docking gear for the ship-lift and marine operations appear across 2022 to 2026.
- Oil and gas work is mostly still to come. The supply base and berth projects are in tender or planning.
- Watch the open notices. On 26 November 2026, CrewDog's Namibia tenders page listed 12 open Namport notices, including two 16 m³ grabs for Walvis Bay (closing 14 December 2026) and three years of rail track (perway) maintenance at Walvis Bay (closing 21 December 2026). Past winners are on Namibia contract awards.
Sources
- Namport, Notice of Bids Awarded, read 26 November 2026: namport.com.na
- Namport, Procurement (open bids), read 26 November 2026: namport.com.na
- Namport, Integrated Annual Report 2026 (year to 31 March 2026), September 2026: namport.com.na
- CrewDog, Namibia contract awards and tenders (data read from Namport's pages at 07:26 UTC), 26 November 2026: contract awards, tenders
How this was made: researched from the sources listed above, with AI help for drafting. See how we write our articles.